side-area-logo

Malakand HPC

Recommend
  • Facebook
  • Twitter
  • Google Plus
  • LinkedIN
  • Pinterest
Share
Tagged in
Leave a reply

Description
OPERATION & MAINTENANCE OF 81 MW MALAKAND-III HYDRO POWER COMPLEX AFI was awarded the O&M contract for 81 MW Hydro Power Project on 12th August, 2015. Formal operation and maintenance activities were taken over on 1st September, 2015. Since then the power station is running satisfactorily and during last one year 455.521 Million KWh (units) energy was dispatched to the grid which is the ever highest net electrical output more than the previous maximum electrical output of 435.793 Million KWh (units) during the year from Sep 2008 to Aug 2009 since the commissioning of Power Plant.  More than two hundred and twenty (220) well experienced engineers & technical / support staff is deployed in the power complex for smooth, efficient & round the clock operation & maintenance of the complex. AFI brought significant improvement not only in periodic maintenance but also general outlook of the equipment and civil structure was improved; thus the deplorable condition of the complex was eradicated and face-lifting is visible and now it gives a grandeur look. Outages were also minimized and utilizing both human resource and financial investment, operational reliability of the complex was enhanced manifold. AFI is proud of its contribution towards uplift of the O&M services of this national asset which is yet another landmark manifestation of AFI in the field of O&M Services
Info